Finance

SpaceX Lists Starship Flight 14 for Sept. 28 Orbital Attempt in Expended Configuration

Marcus SterlingPublished 2month ago3 min readBased on 11 sources
Reading level
SpaceX Lists Starship Flight 14 for Sept. 28 Orbital Attempt in Expended Configuration
Photo by SpaceX on Pexels

SpaceX lists Starship Flight 14 for September 28, 2026, as a Starship launch from Pad 2 at Starbase in an expended configuration.

The flight has a 75-minute launch window opening at 7:15 a.m. CT, according to the mission page SpaceX. The company states the vehicle is preparing to launch as soon as Monday, September 28, pending regulatory approval. Independent coverage lists a NASASpaceflight webcast starting Sept. 28 at 4:15 a.m. EDT (0815 GMT) Space.com.

SpaceX states Flight 14 is the 14th flight of Starship. The company plans it to be the first flight to send Starship into orbit around Earth.

That objective follows a quickening summer cadence. Flight 13 lifted off from Starbase, Texas, on July 24, 2026 at 5:51 p.m. CT. Flight 12 lifted off from Starbase, Texas, on May 22, 2026 at 5:30 p.m. CT. That interval is tight. Two orbital-class test flights in roughly two months, now followed by another attempt about two months later, implies sustained pad turnaround, range coordination and hardware flow.

The stack definition matters for modeling the test. SpaceX refers to the Starship spacecraft and Super Heavy rocket collectively as Starship. The system is described as a fully reusable orbital launch system Reuters. Flight 14 is listed as expended. Hardware is not recovered.

Reusability has been demonstrated in part. SpaceX caught the returning Super Heavy booster back at the launch site during a test flight. Chief executive Elon Musk has said the company would fly a bigger, fully reusable version of Starship in 2026. The manifest entry for Sept. 28, 2026 does not specify that larger variant SpaceX launches manifest. It specifies Pad 2 and expended configuration.

All development, manufacturing, testing and launch of Starship takes place at Starbase in Texas. SpaceX describes Starbase as home to its headquarters and as one of the world's first commercial spaceports designed for orbital missions. The company states launches from Starbase will provide access to destinations in Earth orbit, the Moon, Mars and beyond.

The broader context here is capital intensity meeting flight rate. SpaceX has spent more than $15 billion developing its fully reusable Starship Reuters. An expended orbital attempt writes off a full stack. That is a deliberate trade. Expended configuration buys performance margin and simplifies recovery constraints for a first orbital insertion attempt.

Looking at what this means for launch economics, success criteria divide cleanly. Orbital insertion and controlled flight duration validate the revenue-relevant regime: payload delivery to orbit, on-orbit operations, and deorbit or transfer capability. Booster or ship recovery validates the cost-relevant regime: refurbishment interval, hardware life and cost per kilogram. Flight 14, as manifested, tests the first without proving the second. For balance-sheet analysis, cadence is the bridging variable. Frequent flights amortize fixed infrastructure at Starbase and generate flight data faster, but each expended flight consumes working capital in steel, engines and labor.