World

Ireland's Big Bet on Train Travel Between Dublin, Belfast, and Derry

Elena MarquezPublished 5w ago4 min readBased on 6 sources
Reading level
Ireland's Big Bet on Train Travel Between Dublin, Belfast, and Derry

Ireland's government announced €377 million in spending for projects that connect both sides of the border on 23 June 2026. The single biggest piece — €193 million — will go toward improving rail service between Dublin, Belfast, and Derry, according to the Department of the Taoiseach.

This rail money is part of a wider €230 million commitment for rail across the whole island. The €193 million covers the priority route, but other rail projects will also get funding from the larger pool. The distinction matters because it determines which budget each project uses.

This spending comes from the Shared Island Fund, a long-term programme to invest in infrastructure and communities on both sides of the border. The government committed to adding €1 billion to the fund over ten years, according to Reuters in January 2025. The fund works by giving money directly to projects and partnering with other organisations. It requires cooperation between Dublin and Belfast — and in some cases, London.

Right now, trains between Dublin and Belfast take about two hours to travel between the cities. The tracks and trains are old and haven't really improved in decades. The line between Derry and Belfast is even more limited: parts are single track (imagine a one-lane road for trains), which means trains can't move fast or carry many passengers. The €193 million will only make a real difference if the detailed plans show genuine upgrades — and those plans haven't been published yet.

The Irish government has been releasing smaller tranches from this fund regularly. In November 2025, it allocated over €50 million. In February 2024, it put €12.5 million toward a major road project and matched it with additional transport funds. That road project has faced years of delays in Northern Ireland because of planning and legal challenges. This teaches an important lesson: when a project needs approval from both sides of the border, it moves at the speed of whichever side is slower — and rail projects will face the same problem.

The Shared Island Fund also gives smaller grants to community groups, cultural organisations, and local partnerships along the border. The BBC reported in November 2024 on these grants, which run alongside the big infrastructure projects. This is deliberate: the fund has to show real benefits to communities on both the Irish and Northern Irish sides, not just build fancy transport links.

This funding is officially neutral about whether Ireland's border might eventually change. But in practical terms, spending on rail between Dublin and Belfast does make the two economies more connected. For the Irish government, better cross-border transport strengthens the economy and keeps options open for the future. For Belfast and London, the situation is more complicated: Northern Ireland's government has been inconsistent about joining these projects, and disputes over trade rules (the Protocol) have sometimes gotten in the way.

Now the rail project moves into a planning phase. Irish Rail and Northern Ireland's Translink will need to decide exactly what will be built, when, and who runs it. The European Union may also provide extra funding for cross-border transport through its transport framework, and Dublin usually tries to use that money when it can. The real test comes when the detailed plans are released — then we'll know if this commitment will actually speed things up or remains mainly a political gesture.