Israel Postpones Construction Contracts for E1 West Bank Settlement Expansion

Israel has postponed issuing construction contracts for the E1 settlement expansion in the West Bank, days after the United Kingdom imposed sanctions on building firms working in the area. The Guardian reported the decision on 18 November 2026.
UK Foreign Secretary Ed Miliband sanctioned eight construction firms operating in the E1 area on Monday. Sanctions are government penalties that restrict a target's dealings, in this case with British parties. Israeli diplomats said the postponement was not a response to the British measures.
The E1 announcement had been due on Thursday. The land lies between Jerusalem and Ma'aleh Adumim, a West Bank settlement city of nearly 40,000 residents. According to the report, the E1 tender covered more than 3,401 housing units, and the land cuts through the West Bank, separating it from East Jerusalem.
The move was also shaped by a legal dispute inside Israel. Attorney General Gali Baharav-Miara, the government's senior legal adviser, said a decision on settlement expansion should be taken not by the caretaker government led by Prime Minister Benjamin Netanyahu, which is serving until a new administration is formed, but by that new administration. She ordered the Israel Land Authority, the state agency that manages public land, and the Ministry of Housing not to open the E1 tender process.
Earlier in the month, the Israel Defense Forces began demolishing homes in a Bedouin community within the E1 area. The Bedouin are a traditionally nomadic people, and the demolitions have drawn attention alongside the planned construction.
Gadi Eisenkot, who leads the Change bloc, opposed the E1 expansion. He described it as a mistake that was likely to alienate international opinion.
Separately, Israel enforced the downgrading of the UK consulate in East Jerusalem. The step was taken as a reprisal for Miliband's September decision to try to end trade links with illegal settlements.


